Proposed Mill
Environmental Assessment Report: Major Project - Part 3A Environmental Planning And Assessment Act 1979
1Starches - Environmental assessment (Main Document).pdf
Annexure A - Director Generals Requirements - SS Flour Mill.pdf
Annexure B(i) - Council DGRs_.pdf
Annexure B(i) - DEC Requirements.pdf
Annexure B(i) - DNR requirements.pdf
Annexure B(ii) - DEC Letter re Flour Mill 18 June 2007.pdf
Annexure B(ii) - DWE Letter dated 13 June 07 re Draft EA Flour Mill.pdf
Annexure C - Manildra PHA Issue Rev4.pdf
Annexure E -GEOTUNAN02584-AA-AD.pdf
Annexure F - Figure 2.pdf
Annexure F - Hydraulic Assessment.pdf
Annexure G(ii) - Letter from Buhler re Odour Emission of a Flour Mill.pdf
Annexure G(ii) - Letter from Cabonne Council re Flour Mill.pdf
Annexure G(ii) - Letter from Gunnedah Shire Council.pdf
Annexure G(ii) - Letter from Narrandera Council.pdf
Annexure G(ii).pdf
Annexure G(i).pdf
Annexure H - 3849R44.pdf
Annexure I - Starches Addendum Heritage Report1.pdf
Annexure J - GU02584-AA-AE scan1.pdf
AnnexureJ(ii).pdf
Annexure J - Section 19 Case 1-Water level at RL 0 8m (Figure 19 1).pdf
Annexure J - Section 19 Case 2-Water level at RL 5 1m (Figure 19 2).pdf
Annexure J - Section 19 Case 3-Rapid drawdown with short term parameters (Figure 19 3).pdf
Annexure J - Section 8 Case 2-Water level at RL 4 36m (Figure 8 2).pdf
Annexure J - Section 8 Case 3-Rapid drawdown with short term parameters (Figure 8 3)1.pdf
figure 2.pdf
Figure 3 - FLOUR-GRAIN SILO.Plan.pdf
Figure 4 - FLOUR-GRAIN SILO.Sth.pdf
Figure 5 - FLOUR-GRAIN SILO.West.pdf
Figure 6 - FLOW DIAGRAM.PRODUCTION.11-2006.pdf
Figure 7.pdf